GE Building 66 Exterior
Scope of Project: General Electric converted building 66 from an industrial manufacturing building to the new battery manufacturing building and 60,000 square feet of new office space. Summary: A new HVAC system was designed for the office space utilizing new gas rooftop units. Individual temperature control zones were derived by a variable air volume (VAV)…

Ten Eyck Cooling Tower Replacement
Scope of Project:The project, performed for NYS OGS, included the removal and replacement of the roof mounted cooling towers serving the 16 story Ten Eyck Office building located in Albany, NY. The existing cooling towers, which supplied cooling to the main building heat pump loop, were 22 years old and in need of replacement. Moreover,…

Brookwood Secure Center Chiller Replacement
Scope of Project: The project, performed for NYS OGS, included the removal and replacement of the existing 120-ton chiller serving the Brookwood Secure Center located in Claverack, NY. The existing chiller was 21 years old and was unable to meet the cooling load of the facility. Additionally, the R-22 refrigerant utilized by the chiller was…